MagicMirror Forum
    • Recent
    • Tags
    • Unsolved
    • Solved
    • MagicMirror² Repository
    • Documentation
    • 3rd-Party-Modules
    • Donate
    • Discord
    • Register
    • Login
    A New Chapter for MagicMirror: The Community Takes the Lead
    Read the statement by Michael Teeuw here.

    MMM-Calendar always shows 23:59 if showEndTime: True

    Scheduled Pinned Locked Moved Bug Hunt
    51 Posts 4 Posters 16.5k Views 3 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • S Offline
      sdetweil
      last edited by

      I like how it behaves now… we are both currently on DST, you switch the daylight 1st (Oct 25), and the events when system is on my timezone, change, and then we change later to daylight (Nov 1), and then we are back on the same adjustment again and the event times adjust again correctly…

      Sam

      How to add modules

      learning how to use browser developers window for css changes

      1 Reply Last reply Reply Quote 0
      • S Offline
        SwissChemist
        last edited by SwissChemist

        @sdetweil
        Wow, that looks great! Thanks very much for your endurance!

        There is only that persistent ‘3-weekly whole day’ problem. It’s still one day too late. Most probably that’s so difficult, as it is a user defined interval, something strange seems to bring the parser to a wrong date…
        For testing, I have added a 3-daily event. This shows correct start/end…

        But the rest is great! Thanks very much!!!

        MagicMirror_201005.JPG

        S 1 Reply Last reply Reply Quote 0
        • S Offline
          sdetweil @SwissChemist
          last edited by

          @SwissChemist check the end date in your cal entry it was set for the next day.

          2 -day event

          Sam

          How to add modules

          learning how to use browser developers window for css changes

          1 Reply Last reply Reply Quote 0
          • S Offline
            SwissChemist
            last edited by

            @sdetweil
            All whole day events start at the right day and end one day later. There is no difference in the calendar file, whether it is a weekly, 2-weekly or 3-weekly event.
            That’s why I do not understand, why weeklies and 2-weeklies are shown correctly and the 3-weekly is shown one day too late…

            S 2 Replies Last reply Reply Quote 0
            • S Offline
              sdetweil @SwissChemist
              last edited by

              @SwissChemist but, whole day events are defined as starting and ending on the SAME day.

              Sam

              How to add modules

              learning how to use browser developers window for css changes

              1 Reply Last reply Reply Quote 0
              • S Offline
                sdetweil @SwissChemist
                last edited by

                @SwissChemist yeh, that 3-weekly whole day event seems to cause a problem in the rule handler…

                for THAT rule, it returns the repeating day as the 1st of the 2, (the last of the 2 for the others)
                but if u take off the ;BYDAY=TH
                is works properly… (and gives the thrusday date)

                so, some bug in the rrule module… (not our code)

                that is also the only weekly whole day rule you have which has a ByDay set.

                Sam

                How to add modules

                learning how to use browser developers window for css changes

                S 1 Reply Last reply Reply Quote 0
                • S Offline
                  SwissChemist @sdetweil
                  last edited by

                  @sdetweil
                  As I wondered if the format of an 3-weekly event in ical has an issue, I set up a 3-weekly event in Google calendar and compared the files:

                  BEGIN:VEVENT
                  DTSTART;VALUE=DATE:20201005
                  DTEND;VALUE=DATE:20201006
                  RRULE:FREQ=WEEKLY;INTERVAL=3;BYDAY=MO
                  DTSTAMP:20201005T195008Z
                  UID:835F136F-35A4-44C6-AA16-481F02E5A2D1
                  CREATED:20201005T120626Z
                  DESCRIPTION:
                  LAST-MODIFIED:20201005T120626Z
                  LOCATION:
                  SEQUENCE:0
                  STATUS:CONFIRMED
                  SUMMARY:3-weekly whole day test
                  TRANSP:OPAQUE
                  END:VEVENT
                  

                  Event has been set to 5th of October and DTEND is also one day later than DTSTART for a whole-day-event and it also shows a BYDAY, that means it’s absolutely identical to the ical file…

                  S 1 Reply Last reply Reply Quote 0
                  • S Offline
                    sdetweil @SwissChemist
                    last edited by

                    @SwissChemist like I said, bug in the repeating rule processor, RRULE. not our code.

                    Remove the byday, or the second day

                    Sam

                    How to add modules

                    learning how to use browser developers window for css changes

                    S 1 Reply Last reply Reply Quote 0
                    • S Offline
                      SwissChemist @sdetweil
                      last edited by

                      @sdetweil
                      Sorry for asking:
                      If I would import a calendar file from a text file, it would be easy to do the correction (change DTEND or remove BYDAY) in any text editor.
                      But how to proceed if I directly import data from *.ics link? Is there any ‘hack’ I could apply?
                      Thanks very much for your patience… All other data are really great now! And somehow I rely on a 3-weekly whole day, as we use to have 3-week iterations in our SCRUM process…

                      S 1 Reply Last reply Reply Quote 0
                      • S Offline
                        sdetweil @SwissChemist
                        last edited by

                        @SwissChemist you could create a batch script, run off cron, or started w pm2 (and use sleep to wait)

                        curl to download the ics,
                        sed to fix the file,
                        and put it into the calendar module folder, and
                        config mm to use it from there

                        Sam

                        How to add modules

                        learning how to use browser developers window for css changes

                        1 Reply Last reply Reply Quote 0
                        • 1
                        • 2
                        • 3
                        • 4
                        • 5
                        • 6
                        • 4 / 6
                        • First post
                          Last post
                        Enjoying MagicMirror? Please consider a donation!
                        MagicMirror created by Michael Teeuw.
                        Forum managed by Sam, technical setup by Karsten.
                        This forum is using NodeBB as its core | Contributors
                        Contact | Privacy Policy