Read the statement by Michael Teeuw here.
Releasing stable
-
Since MagicMirror² is currently only available as a beta, and the āoldā version is still the master branch, I was wondering what you guys think should be the point to release v2 as the master branch?
-
Maybe once all the open calendar issues are closed? :smile:
-
šæš - Boy, do I hate that module ⦠;)
-
You have my deepest sympathies š
-
Besides the Facebook issues, with else is wrong with the Calendar module?
-
It appears some feeds cant be loaded. But I canāt reproduce it. https://github.com/MichMich/MagicMirror/issues/221
-
We also need to fix the installer (so we donāt need to manually set the latest node version) and the translation system.
-
@MichMich, unfortunately I canāt reproduce that. Iām using my own private Google calendar and it loads just fine.
-
@KirAsh4 same here. It might have something to do with a module not working on a Pi B+ (like Curl)
-
Hrm, I have one of those but itās currently in service for something else. Rats. Should probably get another one anyway (and another rPi-3 as well.) But, that makes me wonder if itās simply software that needs updating ā¦
-
Ugh ⦠I should be beaten with a stick. I knew I forgot something. I ordered another rPi-3 yesterday and completely forgot to add an rPi-2 to the order to use as dev/test platform. But, I did order more HDMI cables and uSD cards ⦠just forgot the rPi itself. Oh well ⦠another shipping charge. Iāll get it eventually ā¦
-
Hey @MichMich, youāre certain itās the rPi B+ (512Mb) that has the curl issue, not the rPi-2 B (1Gb)? Perhaps this is one of those times where telling folks to upgrade their hardware is a better/easier solution considering a) how cheap they are, and b) hardware-wise, weāre several iterations ahead already. Thereās a point where supporting older hardware (running older and unsupported base software) just becomes a pain.
-
Agree. I donāt make any modifications for older pies.
-
@MichMich I do have the same issue on my RP 3 , all calenders are working only my private google calender doesnāt
-
Hey @Wilco89, can you try creating a secondary private calendar, and importing that, see if it works? If it too fails, can you share that second URL with me so I can try to debug it?
-
Most issues seem to be solved, and the translation system is completed. Iām waiting for some feedback on the āwonkyā time overflow, and might then move beta to stable.
What do you guys suggest to be the best approach? Shall we keep a beta repository as well?
-
I think it is pretty stable, and think that future improvements should be worked out in a beta version.
-
We could release v2 (stable), keep v2-beta to continue developing on that release. Or, start a new branch (v2-StuffWeThoughtWorkedButReallyDoesnt)⦠Or just start with v2.1, v2.2 etc., etc. At least till thereās another major update, or weāve mucked with it so much that itās not really a base v2 anymoreā¦
-
Yeah, probably gonna move current master to 1.0, move v2-beta to master, and create a develop branch. Agree?
-
Yep, that sounds like a plan.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better š
Register Login