Just add calendars into your defaultcalendar
module, without touching CX3. -
{ module: "calendar", header: "calendar source", position: "top_left", // <-- Remove this line to hide this module. config: { broadcastPastEvents: true, maximumNumberOfDays: 45, calendars: [ { symbol: "calendar-check", url: "https://ics.calendarlabs.com/709/45a0bb64/Fun_Holidays.ics", color: "red", }, { symbol: "car-side", url: "webcal://sync.roktcalendar.com/webcal/cb99a33a-87e2-47a6-a11a-69f2eb563101", color: "orange", }, { symbol: "recycle", url: "https://www.kriftel.de/kalender/abfallkalender-2023-bezirk-1-3/events.ics", color: "green", }, ] } },
I just added additional calendars to the default calendar module.
It will show; -
@MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.
-
@pastormingle said in MMM-CalendarExt3:
@MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.
weeksInView:1
would one-week view of CX3. But what you really want wasdays
view of CX2, and I have dropped that view from CX3 (Because the newCalendarExt3Agenda
will get the role alternately, And I think it is better organized and easy to get info.)But if you prefer old
days
view style, just use legacy CX2 instead. -
@MMRIZE When i put in for 3 calendar it’s only displaying the one for google1 account.
{ module: "calendar", header: "calendar source", position: "top_left", // <-- Remove this line to hide this module. config: { broadcastPastEvents: true, maximumNumberOfDays: 45, calendars: [ { symbol: "calendar-check", url:"outlook", color: "red", }, { symbol: "car-side", url:"google1", color: "orange", }, { symbol: "recycle", url:"google2", color: "green", }, ] } }, { module: "MMM-CalendarExt3", position: "bottom_bar", header: "My Calendar for 3 weeks", config: { mode: 'week', }
-
@pastormingle
Did you test with my example URL or yours?
I need the real URL of calendar feeds to diagnose. send URLs to my email. (eouia0819@gmail.com) -
@MMRIZE should be in your email box… thanks.
-
@pastormingle replied. From now on, let’s discuss this with email. I’ll leave the summary here later.
-
@pastormingle Seems that when i loaded the outlook.ics it takes it about 10 min loaded when add addiational calendars. I have not errors in the log but it just slow to load when you restart if you have other calendars. What could it be? Do you have a fix for this?
-
@pastormingle
Is fetching slow? Or is drawing slow? Different reason, different solution.
If fetching is slow; That is not my bad. Adjust interval of fetching calendar in calendar module.
If drawing is slow(after fetched normally); Adjust waitFetch and refreshInterval. This thing is not “FIX”, just “configuration”However more frequent Fetching would give the ics host server more traffic.
10mins late change, I think it’s sufficiently affordable. Your mirror is not the train time signboard of the station.