• Recent
  • Tags
  • Unsolved
  • Solved
  • MagicMirror² Repository
  • Documentation
  • 3rd-Party-Modules
  • Donate
  • Discord
  • Register
  • Login
MagicMirror Forum
  • Recent
  • Tags
  • Unsolved
  • Solved
  • MagicMirror² Repository
  • Documentation
  • 3rd-Party-Modules
  • Donate
  • Discord
  • Register
  • Login
A New Chapter for MagicMirror: The Community Takes the Lead
Read the statement by Michael Teeuw here.

MMM-CalendarExt3

Scheduled Pinned Locked Moved Utilities
656 Posts 78 Posters 1.9m Views 82 Watching
Loading More Posts
  • Oldest to Newest
  • Newest to Oldest
  • Most Votes
Reply
  • Reply as topic
Log in to reply
This topic has been deleted. Only users with topic management privileges can see it.
  • M Offline
    MMRIZE @pastormingle
    last edited by MMRIZE Jul 28, 2023, 1:15 PM Jul 28, 2023, 1:07 PM

    @pastormingle
    Just add calendars into your default calendar module, without touching CX3.

    1 Reply Last reply Reply Quote 0
    • M Offline
      MMRIZE @pastormingle
      last edited by Jul 28, 2023, 1:10 PM

      @pastormingle

      {
      	module: "calendar",
      	header: "calendar source",
      	position: "top_left", // <-- Remove this line to hide this module.
      	config: {
      		broadcastPastEvents: true,
      		maximumNumberOfDays: 45,
      		calendars: [
      			{
      				symbol: "calendar-check",
      				url: "https://ics.calendarlabs.com/709/45a0bb64/Fun_Holidays.ics",
      				color: "red",
      			},
      			{
      				symbol: "car-side",
      				url: "webcal://sync.roktcalendar.com/webcal/cb99a33a-87e2-47a6-a11a-69f2eb563101",
      				color: "orange",
      			},
      			{
      				symbol: "recycle",
      				url: "https://www.kriftel.de/kalender/abfallkalender-2023-bezirk-1-3/events.ics",
      				color: "green",
      			},
      		]
      	}
      },
      

      I just added additional calendars to the default calendar module.
      It will show;

      62796e78-a3cd-4539-ab50-0aba5ba1c379-image.png

      P 1 Reply Last reply Jul 28, 2023, 1:15 PM Reply Quote 0
      • P Offline
        pastormingle @MMRIZE
        last edited by Jul 28, 2023, 1:15 PM

        @MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.

        M 1 Reply Last reply Jul 28, 2023, 1:24 PM Reply Quote 0
        • M Offline
          MMRIZE @pastormingle
          last edited by Jul 28, 2023, 1:24 PM

          @pastormingle said in MMM-CalendarExt3:

          @MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.

          weeksInView:1 would one-week view of CX3. But what you really want was days view of CX2, and I have dropped that view from CX3 (Because the new CalendarExt3Agenda will get the role alternately, And I think it is better organized and easy to get info.)

          6408e54f-b3ea-410c-a0d1-38f0d5aabbe0-image.png

          But if you prefer old days view style, just use legacy CX2 instead.

          P 1 Reply Last reply Jul 28, 2023, 1:42 PM Reply Quote 0
          • P Offline
            pastormingle @MMRIZE
            last edited by sdetweil Jul 28, 2023, 4:31 PM Jul 28, 2023, 1:42 PM

            @MMRIZE When i put in for 3 calendar it’s only displaying the one for google1 account.

            {
            	module: "calendar",
            	header: "calendar source",
            	position: "top_left", // <-- Remove this line to hide this module.
            	config: {
            		broadcastPastEvents: true,
            		maximumNumberOfDays: 45,
            		calendars: [
            			{
            				symbol: "calendar-check",
            				url:"outlook",
            				color: "red",
            			},
            			{
            				symbol: "car-side",
            				url:"google1",
            				color: "orange",
            			},
            			{
            				symbol: "recycle",
            				url:"google2",
            				color: "green",
            			},
            		]
            	}
            },
               {
            	module: "MMM-CalendarExt3",
            	position: "bottom_bar",
            	header: "My Calendar for 3 weeks",
            	config: {
            		mode: 'week',
            	}
            
            M P 2 Replies Last reply Jul 28, 2023, 2:09 PM Reply Quote 0
            • M Offline
              MMRIZE @pastormingle
              last edited by Jul 28, 2023, 2:09 PM

              @pastormingle
              Did you test with my example URL or yours?
              I need the real URL of calendar feeds to diagnose. send URLs to my email. (eouia0819@gmail.com)

              P 1 Reply Last reply Jul 28, 2023, 2:25 PM Reply Quote 0
              • P Offline
                pastormingle @MMRIZE
                last edited by Jul 28, 2023, 2:25 PM

                @MMRIZE should be in your email box… thanks.

                M 1 Reply Last reply Jul 28, 2023, 2:50 PM Reply Quote 0
                • M Offline
                  MMRIZE @pastormingle
                  last edited by Jul 28, 2023, 2:50 PM

                  @pastormingle replied. From now on, let’s discuss this with email. I’ll leave the summary here later.

                  1 Reply Last reply Reply Quote 0
                  • P Offline
                    pastormingle @pastormingle
                    last edited by Aug 3, 2023, 1:27 PM

                    @pastormingle Seems that when i loaded the outlook.ics it takes it about 10 min loaded when add addiational calendars. I have not errors in the log but it just slow to load when you restart if you have other calendars. What could it be? Do you have a fix for this?

                    M 1 Reply Last reply Aug 3, 2023, 1:54 PM Reply Quote 0
                    • M Offline
                      MMRIZE @pastormingle
                      last edited by Aug 3, 2023, 1:54 PM

                      @pastormingle
                      Is fetching slow? Or is drawing slow? Different reason, different solution.
                      If fetching is slow; That is not my bad. Adjust interval of fetching calendar in calendar module.
                      If drawing is slow(after fetched normally); Adjust waitFetch and refreshInterval. This thing is not “FIX”, just “configuration”

                      However more frequent Fetching would give the ics host server more traffic.
                      10mins late change, I think it’s sufficiently affordable. Your mirror is not the train time signboard of the station.

                      P 1 Reply Last reply Aug 3, 2023, 4:59 PM Reply Quote 0
                      • 1
                      • 2
                      • 30
                      • 31
                      • 32
                      • 33
                      • 34
                      • 65
                      • 66
                      • 32 / 66
                      32 / 66
                      • First post
                        311/656
                        Last post
                      Enjoying MagicMirror? Please consider a donation!
                      MagicMirror created by Michael Teeuw.
                      Forum managed by Sam, technical setup by Karsten.
                      This forum is using NodeBB as its core | Contributors
                      Contact | Privacy Policy