Read the statement by Michael Teeuw here.
MMM-CalendarExt3
-
@MMRIZE Thanks.
-
@MMRIZE No worries, it worked perfectly.
My latest issue is that I’m struggling to refresh the calendar when I add a new event to my google calendar. I’m temporarily working on a local copy to play around with the JS and have this step currently. Would this work or is there an easier/better way that you’ve already built?
forceRefresh: function() { console.log("forceRefresh called"); if (this.refreshTimer) { clearTimeout(this.refreshTimer); this.refreshTimer = null; } this.tempMoment = null; this.stepIndex = 0; this.updateDom(this.config.animationSpeed); } -
@tjat ext3 gets its data from the default calendar module…
there is no notification to force refresh its content. only the fetchInterval.
-
@sdetweil so do I instead need to cause the default calendar module to refresh with my google calendar content?
Everything updates when I close and reload the magic mirror so just trying to update on demand within the same instance.
-
@tjat you cannot cause the default calendar to refresh.
it DOES load the ics on startup…so , only thing you could do is cause a complete restart of the MM app
-
@tjat
The process would go like this;- Receiving events from events provider(default calendar module or something)
- Regularizing them and keeping them in store.
- The view will show in the next cycle of the refresh timer with current stored events.
1)+2) and 3) are separated by parallel running.
So, If you want to refresh the view with new events by force,
- The provider should spit out notification ASAP on new events added.
- After processing the received data, update DOM of the module.
For 1), You can shorten the cycle of the provider fetching. (
fetchIntervalof the default calendar module). However, you should know that frequent requests to .ics could burden the calendar hosting server.For 2), your code may work.(Frankly said, you may need
updateDomonly enough) Or you can just reducerefreshIntervalof CX3 to refresh the view sooner.Ok. here is an additional opinion from an old dotard.
Do you really needreal-timeupdate of the event changing? Without any modification, it will show the change in a while. (default refreshing period is set as10 minutes. ) You can reduce the value to 5 min or even 10 seconds. But is it worthy?Refreshing only on change sounds promising, but using .ics doesn’t work like that. iCalendar service is hosted as a read-only thing, unlike
CALDAV. so there is no easy mechanism to detect the calendar change quickly except for frequent requests. So literally, it would not be anon-demandsolution.Most 99% time of the pulling cycle would not find any new changes from the calendar. That would not be the performance issue for your MM, but for the ics provider, it will cost more traffic. (Of course, GoogleCalendar would be generous. :D )
-
All CX3* modules (CalendarExt3, CalendarExt3Agenda, CalendarExt3Timeline) need event provider(e.g. default calendar module or MMM-GoogleCalendar or something similar) as a source of events. (You can hide the module with configuration or CSS)
Configuration itself is very simple.
{ module: "calendar", header: "Fun Holidays", position: "top_left", config: { broadcastPastEvents: true, maximumNumberOfDays: 45, calendars: [ { fetchInterval: 7 * 24 * 60 * 60 * 1000, symbol: "calendar-check", url: "https://ics.calendarlabs.com/709/45a0bb64/Fun_Holidays.ics", color: "green", } ] } }, { module: "MMM-CalendarExt3", position: "bottom_bar", header: "My Calendar for 3 weeks", config: { mode: 'week', } },It will show;

Everything you need is described in README.md.
But you can get many examples in this thread itself. (Read from first post. :D)The most important part of the configuration would be these;
- mode:
weekormonth.
If you adoptweekview, you might need these also ;weekIndex,weeksInView.
All other options are… just options. You can try whatever you want with fun.
Heavy CSS tweek is possible. You can ask me.
Rather, you may need to carefully config your events provider(usually, default calendar module) - most ambiguous accidents happen there.
- mode:
-
@MMRIZE So on version ext2 i had 3 calendars that combine my weekly and upcoming together only used different colors to differentiate them. How do i add the additional calendars here? I had google calendar and business outlook calendar.
-
@pastormingle I added the calendar but it still only shows the one calendar not the addional calendar on the weekly view. here is my configuration.
{ module: "MMM-CalendarExt3", position: "bottom_bar", title: "Mikes Calendar", config: { mode: "week", instanceId: "basicCalendar", // locale: 'de-DE', weekIndex: 0, maxEventLines: 5, firstDayOfWeek: 1, fontSize: "30px", //calendarSet: ['us_holiday', 'abfall', 'mytest'], calendars: [ { url: "http://outlook.office365.com/owa/calendar/*****f2033a09d6504d21833241fb44dcf8c3c@dxc.com/a53b201c85bf4825a9290ce3ec96a8b2457585490405428856/calendar.ics", auth: { user: "******", pass: "******", }, }, { url:"https://calendar.google.com/calendar/ical/******/private-34995d14cf5ec15efc8bd68f680c508e3/basic.ics", auth: { user: "*******", pass: "C******", }, }, ], }, }, { module: "calendar", header: "Upcoming Meetings", position: "top_left", config: { calendars: [ { fetchInterval: 7 * 24 * 60 * 60 * 1000, symbol: "calendar-check", url: "http://outlook.office365.com/owa/calendar/f2033a0***9d6504d21833241fb44df8c3c@dxc.com/a53b201c85bf4825a92*****b2457585490405428856/calendar.ics", } ] } }, -
@pastormingle please, always use code block for config contents
paste into editor
select pasted text
hit code block button
</>I fixed prior post
-
@pastormingle
Just add calendars into your defaultcalendarmodule, without touching CX3. -
{ module: "calendar", header: "calendar source", position: "top_left", // <-- Remove this line to hide this module. config: { broadcastPastEvents: true, maximumNumberOfDays: 45, calendars: [ { symbol: "calendar-check", url: "https://ics.calendarlabs.com/709/45a0bb64/Fun_Holidays.ics", color: "red", }, { symbol: "car-side", url: "webcal://sync.roktcalendar.com/webcal/cb99a33a-87e2-47a6-a11a-69f2eb563101", color: "orange", }, { symbol: "recycle", url: "https://www.kriftel.de/kalender/abfallkalender-2023-bezirk-1-3/events.ics", color: "green", }, ] } },I just added additional calendars to the default calendar module.
It will show;
-
@MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.
-
@pastormingle said in MMM-CalendarExt3:
@MMRIZE Instead of the month i only one week or 7 days at all time displayed. Once the day has passed it should drop off.
weeksInView:1would one-week view of CX3. But what you really want wasdaysview of CX2, and I have dropped that view from CX3 (Because the newCalendarExt3Agendawill get the role alternately, And I think it is better organized and easy to get info.)
But if you prefer old
daysview style, just use legacy CX2 instead. -
@MMRIZE When i put in for 3 calendar it’s only displaying the one for google1 account.
{ module: "calendar", header: "calendar source", position: "top_left", // <-- Remove this line to hide this module. config: { broadcastPastEvents: true, maximumNumberOfDays: 45, calendars: [ { symbol: "calendar-check", url:"outlook", color: "red", }, { symbol: "car-side", url:"google1", color: "orange", }, { symbol: "recycle", url:"google2", color: "green", }, ] } }, { module: "MMM-CalendarExt3", position: "bottom_bar", header: "My Calendar for 3 weeks", config: { mode: 'week', } -
@pastormingle
Did you test with my example URL or yours?
I need the real URL of calendar feeds to diagnose. send URLs to my email. (eouia0819@gmail.com) -
@MMRIZE should be in your email box… thanks.
-
@pastormingle replied. From now on, let’s discuss this with email. I’ll leave the summary here later.
-
@pastormingle Seems that when i loaded the outlook.ics it takes it about 10 min loaded when add addiational calendars. I have not errors in the log but it just slow to load when you restart if you have other calendars. What could it be? Do you have a fix for this?
-
@pastormingle
Is fetching slow? Or is drawing slow? Different reason, different solution.
If fetching is slow; That is not my bad. Adjust interval of fetching calendar in calendar module.
If drawing is slow(after fetched normally); Adjust waitFetch and refreshInterval. This thing is not “FIX”, just “configuration”However more frequent Fetching would give the ics host server more traffic.
10mins late change, I think it’s sufficiently affordable. Your mirror is not the train time signboard of the station.
Hello! It looks like you're interested in this conversation, but you don't have an account yet.
Getting fed up of having to scroll through the same posts each visit? When you register for an account, you'll always come back to exactly where you were before, and choose to be notified of new replies (either via email, or push notification). You'll also be able to save bookmarks and upvote posts to show your appreciation to other community members.
With your input, this post could be even better 💗
Register Login