@diccon Not a regular forum poster, so hope I’m not offending anyone by “bumping”(?) this topic, but I had the same problem as diccon and fixed it by setting the “locale” attribute of my view to (in my case) “nl-NL” which made the week start on a Monday. And just to “go the extra mile”: “locale: en-GB” has the same effect :-)
Read the statement by Michael Teeuw here.
Best posts made by jops
-
RE: MMM-CalendarExt2 start week on Monday
Latest posts made by jops
-
RE: MMM-CalendarExt2 start week on Monday
@MMRIZE No rush :-) I’ll be patient! CX2 + TimeLine is already sufficient and working for me. Still fiddling with transformation of calendar events, like stripping names from titles because they are redundant in my TimeLine setup: one row for each family member and colors per family member etc
I personally like the static mode of the TimeLine better because I always want to see the entire day (until like 10pm or so). So in dynamic mode, I would still have to show “15 hours” or so, because at 7am I still want to see if there’s an appointment until 10pm…
-
RE: MMM-CalendarExt2 start week on Monday
@MMRIZE Thanks for your reply! I think I saw the new CX3 module and I’m quite excited about it. I’m also immensely impressed by the effort that you and others put in creating these awesome modules!!
I’m holding off on the CX3 module a bit, because I really REALLY want/need the “TimeLine” module that I have connected with the CX2 module… I saw a post somewhere that a TimeLine module for CX3 might arrive at some point in the future… Or can I already install CX3 and use the “CX2-TimeLine” in conjunction with CX3? :grimacing_face:
-
RE: MMM-CalendarExt2 start week on Monday
@diccon Not a regular forum poster, so hope I’m not offending anyone by “bumping”(?) this topic, but I had the same problem as diccon and fixed it by setting the “locale” attribute of my view to (in my case) “nl-NL” which made the week start on a Monday. And just to “go the extra mile”: “locale: en-GB” has the same effect :-)