MagicMirror Forum
    • Recent
    • Tags
    • Unsolved
    • Solved
    • MagicMirror² Repository
    • Documentation
    • 3rd-Party-Modules
    • Donate
    • Discord
    • Register
    • Login
    A New Chapter for MagicMirror: The Community Takes the Lead
    Read the statement by Michael Teeuw here.

    MMM-CalendarExt3

    Scheduled Pinned Locked Moved Utilities
    676 Posts 81 Posters 2.4m Views 85 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • M Offline
      MMRIZE @hrmax23
      last edited by

      @hrmax23
      It sounds unexpected bug. Can you show(or send mail) the screenshot and config?

      1 Reply Last reply Reply Quote 0
      • M Offline
        MMRIZE @hrmax23
        last edited by

        @hrmax23 said in MMM-CalendarExt3:

        Is there a way to show a rolling 4/5 week in the month mode? Basically something like -1 week to +3 weeks rather than showing basically the current month until that month is over.

        I will consider that option.

        it’s currently showing the current day in the 5th week (i.e. still showing April as the current month). If I restart MM, it will update to show May as current month, but doesn’t seem to do it automatically.

        This seems unexpected behaviour. I need your configuration to represent it.

        Also, is there a trick to get the calendar to re-render completely on some interval?

        I think notification CX3_MOVE_CALENDAR with payload {step:0} would refresh current view , but it needs emission from other module.
        Anyway, the view is refreshed by schedule of original calendar fetch. So I don’t think it needs self-refresh timer. And when we solve above unexpected behaviour, you don’t need self-refreshing.

        H 1 Reply Last reply Reply Quote 0
        • H Offline
          hrmax23 @MMRIZE
          last edited by

          @MMRIZE sometime yesterday the calendar finally refreshed so that May is the current month so it appears to have resolved itself. I’m not sure what would have finally triggered it but I’ll check my calendar settings.

          Thanks for considering the rolling 5 week idea!

          1 Reply Last reply Reply Quote 0
          • BKeyportB Offline
            BKeyport Module Developer @MMRIZE
            last edited by

            @MMRIZE

            Well, shoot, here I am waiting for a new Daily and current view. 😢

            If I could get the built in calendar to do what I want it to do, I’d be using that.

            The "E" in "Javascript" stands for "Easy"

            1 Reply Last reply Reply Quote 0
            • luisestradaL Offline
              luisestrada @MMRIZE
              last edited by

              @MMRIZE Thank you for your answer. :)

              Another question, where does this take the Spanish translation from? For some reason the number is not separated from the text.

              It says “9de Mayo” instead or “9 de Mayo”

              M 1 Reply Last reply Reply Quote 0
              • M Offline
                MMRIZE @luisestrada
                last edited by

                @luisestrada

                This might be a help.

                /* In your custom.css */
                .CX3 .cellDate .dateParts.literal {
                  margin-left: 5px;
                }
                

                24198132-fbaa-4626-b8b9-742353751b09-image.png

                1 Reply Last reply Reply Quote 0
                • luisestradaL Offline
                  luisestrada
                  last edited by

                  @MMRIZE said in MMM-CalendarExt3:

                  /* In your custom.css */
                  .CX3 .cellDate .dateParts.literal {
                  margin-left: 5px;
                  }

                  Thank you so much, muchas gracias :)

                  1 Reply Last reply Reply Quote 0
                  • M Offline
                    MMRIZE
                    last edited by

                    1.1.0 (2022-05-29)

                    • ADDED : control interval of refreshing on fetching calendar
                      • config option waitFetch for waiting for too frequent fetching.
                      • config option refreshInterval for refresh view by force.
                      • config option glanceTime for focusing temporal moment then returning to current moment
                      • config option animationSpeed for update animation
                    • ADDED : calendar symbol can be used. (config option useSymbole)
                    • ADDED : weather forecast could be displayable. (From MM 2.20 released or MM 2.19 develop branch)
                    • CHANGED : Now, month view could has a fit weeks by the days not fixed 6 weeks.

                    1.1.0

                    1 Reply Last reply Reply Quote 0
                    • A Offline
                      almightyyoshi
                      last edited by

                      Just a couple of quick questions. First, how do you remove icons from events? I see in the sample pics that it’s been done, but I can’t seem to make it happen. Second, in CalExt2, I could style event borders and would show/color those instead of having a completely filled in event color. I could also show only certain borders (for full day I only had the left and bottom, but single day events only had the left border). Is that possible with CalExt3?

                      M 1 Reply Last reply Reply Quote 0
                      • M Offline
                        MMRIZE @almightyyoshi
                        last edited by

                        @almightyyoshi

                        1. Not to use symbol: useSymbol: false
                        // config of your module;
                        ...
                        config: {
                          useSymbol: false,
                        ...
                        
                        1. Is this what you wanted?
                          f730144a-9e08-47ef-89e2-115b91f16306-image.png
                        /* in your custom.css */
                        .CX3 .event.fullday,
                        .CX3 .event.multiday {
                          border-left: 4px solid var(--calendarColor);
                          border-bottom: 1px solid var(--calendarColor);
                          background-color: rgba(0, 0, 0, 0.2);
                        }
                        
                        .CX3 .event.singleday {
                          border-left:4px solid var(--calendarColor);
                        }
                        
                        .CX3 .event.singleday:not(.useSymbol)::before {
                          content: '';
                        }
                        
                        A 1 Reply Last reply Reply Quote 0
                        • 1
                        • 2
                        • 64
                        • 65
                        • 66
                        • 67
                        • 68
                        • 67 / 68
                        • First post
                          Last post
                        Enjoying MagicMirror? Please consider a donation!
                        MagicMirror created by Michael Teeuw.
                        Forum managed by Sam, technical setup by Karsten.
                        This forum is using NodeBB as its core | Contributors
                        Contact | Privacy Policy