I think I figured out the problem. I can see other recent events added to these calendars. I think since they are older calendars they fall outside of the maxItems: 100, beforeDays: 60, afterDays: 365, maxIterations: 100 ranges. I tried adjusting those to go back to the start of the calendars and when I do it doesn’t pull in any events from any of my calendars. I’m not sure how to fix this.
Read the statement by Michael Teeuw here.
Posts
-
RE: MMM-CalendarExt2
-
RE: MMM-CalendarExt2
So, I tried a public google calendar as well as 2 of my private shared google calendars. The shared public one does not work, 1 of my shared one works, and 1 does not within the module. However, all of these calendars work in the default upcoming events module. Any suggestions on why this is? Also, I tried changing the “calendarfetcher.js” in the default calendar folder and with that change the default calendar stopped working, but the mmm-calendarext2 worked.
-
RE: MMM-CalendarExt2
Hello, I’m having several issues. Im new to coding for the most part. I took a couple basic web design classes about 12 years ago.
I was working on my magic mirror for about 12 hours yesterday. The major issue being my events are not loading from my Google calendar. I used it in the standard upcoming holidays module to make sure I was linking it correctly. They show up there, but not in the calenderext2. The other issue is sizing. Its larger than the screen viewing area. I’m sure I’m doing something wrong. I copied the example that was posted in the file and it changes the css look but not the size and events still dont show up. Any help would be appreciated.