MagicMirror Forum
    • Recent
    • Tags
    • Unsolved
    • Solved
    • MagicMirror² Repository
    • Documentation
    • 3rd-Party-Modules
    • Donate
    • Discord
    • Register
    • Login
    A New Chapter for MagicMirror: The Community Takes the Lead
    Read the statement by Michael Teeuw here.

    MMM-CalendarExt3

    Scheduled Pinned Locked Moved Utilities
    676 Posts 81 Posters 2.4m Views 85 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • M Offline
      MMRIZE @roth_nj
      last edited by

      @roth_nj
      You don’t have to read entire posts on this thread. Just read the README md first.
      And there is the feature description of what you want probably.

      1 Reply Last reply Reply Quote 0
      • R Offline
        roth_nj @hrmax23
        last edited by

        @hrmax23 said in MMM-CalendarExt3:

        @MMRIZE Is there a way to show a rolling 4/5 week in the month mode? Basically something like -1 week to +3 weeks rather than showing basically the current month until that month is over.

        Also, is there a trick to get the calendar to re-render completely on some interval? On my MM right now, it’s currently showing the current day in the 5th week (i.e. still showing April as the current month). If I restart MM, it will update to show May as current month, but doesn’t seem to do it automatically. I only have 1 scene so not using MMM-Scenes.

        @MMRIZE said in MMM-CalendarExt3:

        @roth_nj
        You don’t have to read entire posts on this thread. Just read the README md first.
        And there is the feature description of what you want probably.

        i did. again, im new to all of this. i am not a programmer at all in any sense. im an ME but did have to take a c++ course like 20 years ago. my brain just doesn’t see this stuff easily. i can read through the readme’s for various modules and get the basic functions but then i have been reading through all the trouble shooting threads about them to get a better understanding on how to actually do it.

        at this point im guessing something on the css level with transforming or preprocessing the data?

        1 Reply Last reply Reply Quote 0
        • BKeyportB Offline
          BKeyport Module Developer @MMRIZE
          last edited by BKeyport

          @MMRIZE the background highlighting issue is shown in my screenshot. If you look at October 11 in the shot, you’ll notice the highlight is smaller than the text.
          Same goes for the full day event shown on Nov 2, the highlight is blocking the “2” partially.

          That being said, I’m gonna work on expanding my module to do a big calendar instead. I’m not getting what I want even with monkeypatch, and it’s getting too confused.

          The "E" in "Javascript" stands for "Easy"

          M 1 Reply Last reply Reply Quote 0
          • B Offline
            bicolorbore586 @roth_nj
            last edited by bicolorbore586

            @roth_nj in the config of the module set the ‘mode’ to week. The add the config option ‘weeksInView’ and set that to 4 or 5
            Here’s an extract from mine:

            {
            			module: "MMM-CalendarExt3",
            			position: "lower_third",
            			config: {
            				mode: "week",
            				weekIndex: 0,
            				weeksInView: 5,
            		
            

            As MMRIZE says, it’s in the readme file (under config details). The re-render, as you say is also listed in there, as one of the intervals.

            R 1 Reply Last reply Reply Quote 0
            • R Offline
              roth_nj @bicolorbore586
              last edited by

              @bicolorbore586 said in MMM-CalendarExt3:

              @roth_nj in the config of the module set the ‘mode’ to week. The add the config option ‘weeksInView’ and set that to 4 or 5
              Here’s an extract from mine:

              {
              			module: "MMM-CalendarExt3",
              			position: "lower_third",
              			config: {
              				mode: "week",
              				weekIndex: 0,
              				weeksInView: 5,
              		
              

              As MMRIZE says, it’s in the readme file (under config details). The re-render, as you say is also listed in there, as one of the intervals.

              thanks… trust me, i read all that stuff a number of times. it just didn’t click that thats what i meant. im going to go bang my head against the wall now ha ha

              1 Reply Last reply Reply Quote 0
              • A Offline
                aircliff
                last edited by aircliff

                Have another issue I just recently noticed. I have two different modules running, one in day view showing one week worth of calendar. The other is in month view. The day view is set with dayIndex of 0 so the current day is the first day. Day 7 on the view shows no events although they are shown for that day on the month view calendar. I could not find any similar posts with issues in this thread so hoping someone has seen and can provide some help. Here are screenshots for reference. It is always the last day in the day view, so for right now Tuesday the 24th is where the issue lies. I’ve changed weeksInView to 2 and it was always just the last day of the series.

                Week View:
                ad6951bd-e51a-4da0-b6f1-f86901dd2746-image.png

                Month View:
                3dc9d351-be9b-4776-8774-0a2ecaf1223b-image.png

                M 2 Replies Last reply Reply Quote 0
                • M Offline
                  MMRIZE @aircliff
                  last edited by

                  @aircliff
                  Maybe the bug. I’ll inspect it. :)

                  1 Reply Last reply Reply Quote 0
                  • M Offline
                    MMRIZE @aircliff
                    last edited by

                    @aircliff
                    I found where the bug lies on.

                    https://github.com/MMRIZE/MMM-CalendarExt3/blob/28c3aeabfbc5b0ebc28107831dcbacd125578d0a/MMM-CalendarExt3.js#L436

                    I’ll fix it tomorrow. :)

                    A 1 Reply Last reply Reply Quote 0
                    • A Offline
                      aircliff @MMRIZE
                      last edited by

                      @MMRIZE

                      Thank you. I actually played with it quite a bit last week and specifically that line and couldn’t get it to work for me. I would end up adding a second week or multiple extra days. Interested to see what you find as the fix.

                      M 1 Reply Last reply Reply Quote 0
                      • M Offline
                        MMRIZE @aircliff
                        last edited by

                        @aircliff
                        fixed. (1.6.1)
                        https://github.com/MMRIZE/MMM-CalendarExt3#history

                        A 1 Reply Last reply Reply Quote 0
                        • 1
                        • 2
                        • 35
                        • 36
                        • 37
                        • 38
                        • 39
                        • 67
                        • 68
                        • 37 / 68
                        • First post
                          Last post
                        Enjoying MagicMirror? Please consider a donation!
                        MagicMirror created by Michael Teeuw.
                        Forum managed by Sam, technical setup by Karsten.
                        This forum is using NodeBB as its core | Contributors
                        Contact | Privacy Policy