Read the statement by Michael Teeuw here.
MMM-CalendarExt3
-
@luisestrada
Displaying the weather icon is an experimental feature. It would be applied from the next version of MagicMirror (ver 2.20) which will be released the next July.At this moment(with the current MagicMirror 2.19), you can try like this;
cd MagicMirror // Your MM installed directory git pull // to update latest version. If your MM was quite old, you might need additional command `npm install` git checkout develop // Change the branch to develop version.
You don’t need this method after July.
-
@MMRIZE if they used my script to install they need a different command
see
https://forum.magicmirror.builders/topic/14327/testing-new-fixes-or-solving-current-problems-with-next-release-code -
@MMRIZE I may prefer to wait until July then. :smiling_face_with_smiling_eyes:
And thank you so much for the recent update. Now the calendar works perfectly, no blinking and no black calendar as before. Works perfectly
-
Hi, I’m using CalendarExt2 with the MMM-CalendarExtPlan Plugin. This totaly fits my needs with having several calendars next to each other with different type of information for the upcoming days. Currently it looks like this is not possible with CalendarExt3, right?
Is CalendarExt2 not going to be maintained anymore in the near future?Thanks for the great work btw,!
-
Thanks for using CX2. I think it is an almost-perfect module which I made. However, some people feel so difficult to use it. So I made a new one, CX3
While CX2 is enough for your purpose, just use it until you find a better alternative.
Anyway, I will not maintain it in near future. The most main reason is, that it is too heavy and severely dependent on other node-dependencies.For the ExtPlan (and agenda view), I will provide an equivalent module for CX2 someday.
-
@MMRIZE said in MMM-CalendarExt3:
For the ExtPlan (and agenda view), I will provide an equivalent module for CX2 someday.
Hope you mean CX3 ;)
Will wait until its done and closely monitor the evolution of CX3. Thanks again for your contribution, really good work! -
@OliWer
:) CX3 indeed. -
@MMRIZE When are you adding “upcoming” view in CX3? :rolling_on_the_floor_laughing:
-
@MMRIZE
How to add a event where do you place.{ "title": "Leeds United - Chelsea", "startDate": 1650193200000, "endDate": 1650199500000, "fullDayEvent": false, "class": "PUBLIC", "location": false, "geo": false, "description": "...", "today": false, "symbol": ["calendar-alt"], "calendarName": "tottenham", "color": "gold", "calendarSeq": 1, // This would be the order from `calendarSet` of configuration "isPassed": true, "isCurrent": false, "isFuture": false, "isFullday": false, "isMultiday": false }
-
@Dav8574
??? I cannot understand what you meant. Explain in more detail what you want.