MagicMirror Forum
    • Recent
    • Tags
    • Unsolved
    • Solved
    • MagicMirror² Repository
    • Documentation
    • 3rd-Party-Modules
    • Donate
    • Discord
    • Register
    • Login
    A New Chapter for MagicMirror: The Community Takes the Lead
    Read the statement by Michael Teeuw here.

    MMM-CalendarExt3

    Scheduled Pinned Locked Moved Utilities
    676 Posts 81 Posters 2.4m Views 85 Watching
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • C Offline
      CurlyQ12391 @MMRIZE
      last edited by

      @MMRIZE,

      That did the trick! Adding “weekday” prevented the image from populating on multiple cells :) This module is by far my favorite because of how customizable it is.

      /* Labor Day - First Monday in September */
      .CX3 .month_9.date_1.weekday_1,
      .CX3 .month_9.date_2.weekday_1,
      .CX3 .month_9.date_3.weekday_1,
      .CX3 .month_9.date_4.weekday_1  {
        background-image: url("/modules/MMM-CalendarExt3/Backgrounds/LaborDay");
        background-position: center center;
        background-size: 60%;
        background-repeat: no-repeat;
      }
      

      The only one I haven’t been able to figure out is Easter Sunday because it is the first between March 22 and April 25. I dont believe CSS can handle that type of logic, maybe JS but thats a little too complex for me. For now I will just leave Easter off the calendar.

      M 2 Replies Last reply Reply Quote 0
      • M Offline
        MMRIZE @CurlyQ12391
        last edited by

        @CurlyQ12391
        I think it is possible with “manipulateDateCell”. I will show example after my return from a business trip in a few days.

        1 Reply Last reply Reply Quote 0
        • M Offline
          MMRIZE @CurlyQ12391
          last edited by MMRIZE

          @CurlyQ12391

          {
            module: "MMM-CalendarExt3",
            position: "bottom_bar",
            config: {
              mode: 'month',
              manipulateDateCell: (dom, events) => {
                let date = new Date(+dom.dataset.date)
                if (date.getMonth() == 8 && date.getDate() == 2) { // specific cell by absolute date
                  dom.classList.add('specialHoliday')
                  dom.style.backgroundColor = 'red'
                  // do whatever you want.
                }
          
                if (events.some(e => e.title.search("Gelber") > -1)){ // specific cell by event
                  dom.classList.add('specialEvent')
                  dom.style.backgroundColor = 'yellow'
                  // do whatever you want.
                }
              }
            }
          },
          

          107e15de-2d5a-4b38-bab6-0eb97f9dbe53-image.png

          1 Reply Last reply Reply Quote 0
          • N Offline
            nekreg9
            last edited by

            How can I delay the start of the MMM-CalendarExt3 module? I have the default calendar module showing and I can see the 3 calendars load events into it. The problem is CalendarExt3 starts while the calendars are still loading. I changed the refreshInterval to more frequent to deal with that, but really a delay start would be more efficient.

            I supposed this would only be a problem while I am troubleshooting.

            M 1 Reply Last reply Reply Quote 0
            • M Offline
              MMRIZE @nekreg9
              last edited by

              @nekreg9
              There is a configurable option “waitFetch”.
              But I doubt your real issue would be that. Because, CX3 starts rendering after one calendar which has at least one event have fetched successfully. (and in a “waitFetch”, no more calendar is fetched)
              So if your CX3 starts late, It means your events source provider(usually default calendar module) might have timing issue to fetch calendars(e.g. too frequent fetch cycles or something else)

              1 Reply Last reply Reply Quote 0
              • K Offline
                Kaisies 0
                last edited by

                Is it at all possible to alter the grid to only divide the screen into 5 sections? I was able to alter code to only show m-f, but the sat and sun sections are still there. Just completely blank. For the life of me I can’t figure out where in the code it sets this part up.

                M 2 Replies Last reply Reply Quote 0
                • M Offline
                  MMRIZE @Kaisies 0
                  last edited by

                  @Kaisies-0
                  1f6f210b-dd20-4887-b394-f2525233ad7b-image.png

                  1 Reply Last reply Reply Quote 0
                  • M Offline
                    MMRIZE @Kaisies 0
                    last edited by MMRIZE

                    @Kaisies-0
                    Anyway,
                    For the firstDayOfWeek: 1 (Week starts from Monday), It could be achieved like below;

                    .CX3 .weekGrid {
                      grid-template-columns: repeat(5, [cell-start] 1fr [cell-end]) 0fr 0fr;
                    }
                    
                    .CX3 .weekday.weekday_6,
                    .CX3 .weekday.weekday_0 {
                      display: none;
                    }
                    
                    .CX3 .cell.weekday_6,
                    .CX3 .cell.weekday_0 {
                      display: none;
                    }
                    

                    This will work.
                    ca91b736-4bef-46da-8af9-93877ca4a0e0-image.png
                    But for the firstDayOfWeek:0 or another case, .weekGrid should be adjusted more heavily. And not sure side-effects.

                    BKeyportB 1 Reply Last reply Reply Quote 0
                    • BKeyportB Offline
                      BKeyport Module Developer @MMRIZE
                      last edited by

                      @MMRIZE I wanna do things a little different (of course) - what I’d like is to have CX3 display the calendar symbol only. No title, preferably horizontally. I can get the title out of the way, but the rest of it I’m not quite sure how - for some reason I’m having a hard time deconstructing how you build.

                      Thanks!

                      The "E" in "Javascript" stands for "Easy"

                      M 2 Replies Last reply Reply Quote 0
                      • M Offline
                        MMRIZE @BKeyport
                        last edited by

                        @BKeyport

                        Is this what you want?
                        ff1c0f88-fc4b-4def-b904-2e49216dc86e-image.png

                        BKeyportB 1 Reply Last reply Reply Quote 0
                        • 1
                        • 2
                        • 3
                        • 4
                        • 5
                        • 67
                        • 68
                        • 1 / 68
                        • First post
                          Last post
                        Enjoying MagicMirror? Please consider a donation!
                        MagicMirror created by Michael Teeuw.
                        Forum managed by Sam, technical setup by Karsten.
                        This forum is using NodeBB as its core | Contributors
                        Contact | Privacy Policy